Flat bottom found fouled with barnacles and sea growth from 1cm up to 3cm thick. No abnormalities of any nature were observed. Vertical sides found 30% fouled with sea grass from 1cm up to 10cm and barnacles from 1cm up to 3cm thick. No abnormalities of any nature were observed. Curves were found 70% fouled with marine growth from 2cm up to 3cm thick. No abnormalities of any nature were observed. Four bladed pitch propeller was found 20% fouled with barnacles up to 1cm thick. No damages observed. Rudder found 70% fouled with marine growth up to 1cm and 30% with barnacles from 1cm up to 2cm thick. No abnormalities were observed. Sea chest gratings found 60% fouled with barnacles. All grids found in position with securing arrangement. Bow thruster blades 40% fouled with barnacles and bow thrust tunnel 70% fouled with barnacles from 1cm up to 3cm thick. Bilge keels found 80% fouled with barnacles up to 3cm thick. No abnormalities were observed. Anodes found 40% depleted. Tail-shaft found entangled with a great mass of fishnets which were dismounted and removed.
THE CHALLENGES
CASE STUDY DESCRIPTION
CASE STUDY PHOTOS
PROJECT DETAILS
Categories: | |
Client: | CAFIMAR RIMORCHIATORI LAZIALI S.P.A |
Location: | Volos, Greece |